Housing performance
We regularly check how well we are delivering housing services and keeping our homes safe. This page shows our latest performance figures and whether things are improving.
These tables show our results for the last three months. Each month we add the latest figures and remove the oldest.
'Change' compares the latest month with last month. 'Improved' means the figure is better, 'Declined' means it is worse and 'Sustain' means it has stayed the same.
Last updated: Monday, 2 November 2026. These figures cover July to September 2026.
On this page:
- Compliance performance
- Fire risk assessment actions
- Repairs performance
- Home condition performance
- Complaints performance
Compliance performance
We carry out regular safety checks on our homes, including gas, electrical and water safety checks and fire risk assessments. These checks help keep tenants safe, and all have a target of 100%.
On a small screen, swipe left or right to see all the figures in each table.
| Safety check | Target | Jul 2026 Two months ago |
Aug 2026 Last month |
Sep 2026 This month |
Change |
|---|---|---|---|---|---|
| Asbestos checks | 100% | 100% | 100% | 100% |
Sustain
|
| Carbon monoxide alarms | 100% | 77% | 80% | 83% |
Improved
|
| Electrical checks (communal areas) | 100% | 96% | 99% | 100% |
Improved
|
| Electrical checks (homes) | 100% | 78% | 82% | 87% |
Improved
|
| Fire risk assessments | 100% | 100% | 100% | 100% |
Sustain
|
| Gas checks (communal areas) | 100% | 100% | 100% | 100% |
Sustain
|
| Gas checks (homes) | 100% | 99.77% | 99.76% | 99.91% |
Improved
|
| Lift safety checks (passenger lifts) | 100% | 100% | 97.87% | 100% |
Improved
|
| Smoke alarms | 100% | 76% | 79% | 82% |
Improved
|
| Water safety checks (legionella) | 100% | 100% | 100% | 100% |
Sustain
|
Fire risk assessment actions
A fire risk assessment is a check of how safe one of our buildings is from fire. It lists any work we need to do to make the building safer. We call this work fire risk assessment actions.
On a small screen, swipe left or right to see all the figures in each table.
| Actions | Jul 2026 Two months ago |
Aug 2026 Last month |
Sep 2026 This month |
|---|---|---|---|
| Total open actions | 1,021 | 978 | 869 |
| Total overdue actions | 471 | 851 | 617 |
Repairs performance
A repair request is created whenever a tenant tells us something needs fixing in their home. We treat repairs as emergencies when they are an immediate risk to health, safety or security, such as a gas leak or no heating in winter. All other repairs are non-emergency.
On a small screen, swipe left or right to see all the figures in each table.
| Measure | Target | Jul 2026 Two months ago |
Aug 2026 Last month |
Sep 2026 This month |
Change |
|---|---|---|---|---|---|
| Non-emergency repairs completed on time | 100% | 84% | 85% | 83% |
Declined
|
| Emergency repairs completed on time | 100% | 93% | 94% | 93% |
Declined
|
You can find out more about repairs timescales.
Overdue repairs
If a repair is not finished within its target time, it becomes overdue. The table below shows how many overdue repairs were still open at the end of each month, grouped by how long they have been waiting.
On a small screen, swipe left or right to see all the figures in each table.
| Repairs overdue by | Jul 2026 Two months ago |
Aug 2026 Last month |
Sep 2026 This month |
Change |
|---|---|---|---|---|
| Less than three months | 905 | 741 | 629 |
Improved
|
| Three to six months | 255 | 302 | 349 |
Declined
|
| 6 to 12 months | 166 | 145 | 112 |
Improved
|
| More than 12 months | 4 | 2 | 4 |
Declined
|
Home condition performance
We carry out condition surveys to check the state of each home we own, looking at things like the roof, windows, kitchen and bathroom. This helps us plan future repairs and improvements. We also measure how many homes meet the government's Decent Homes Standard, which sets out the minimum a home must meet to be safe, warm and in good repair.
Surveys have to be verified before we can report them, and this takes time. This means the figures in this section always run one month behind the rest of the page.
On a small screen, swipe left or right to see all the figures in each table.
| Measure | Target | Jul 2026 Two months ago |
Aug 2026 Last month |
Sep 2026 This month |
Change |
|---|---|---|---|---|---|
| Homes with an up-to-date condition survey (within the last five years) | 100% | 84% | 86% | 87% |
Improved
|
| Homes that meet the Decent Homes Standard | 100% | 89.97% | 90.42% | 90.1% |
Declined
|
Complaints performance
When a tenant makes a formal complaint about our services, we have a legal obligation to respond within set timescales. We follow a two-stage process. Stage one is our initial response. If a tenant remains unhappy after stage one, they can escalate to stage two. Both stages have a target of 100%.
On a small screen, swipe left or right to see all the figures in each table.
| Measure | Target | Jul 2026 Two months ago |
Aug 2026 Last month |
Sep 2026 This month |
Change |
|---|---|---|---|---|---|
| Stage one complaints responded to on time | 100% | 87% | 92% | 94% |
Improved
|
| Stage two complaints responded to on time | 100% | 100% | 100% | 100% |
Sustain
|